2.1.4.8.1.1.1. To Do List

 
From the Utilities Menu > To Do List
 
 
 
All the new cost codes categories are recorded in the “To Do List”.
 
 
Review the “To Do List” before exporting to Sage 300 CRE.
 
Delete codes that should not be posted to Sage 300 CRE.
 
Next Step:  Add Job Codes in Timberscan. Utilities > Add Job Codes
 
 
 
 
 
 
 
 
 
 
 

The help manual was created with Dr.Explain